modular street view

Construction
built like
a factory.

We manufacture fully-integrated wall panels -
structure, wiring, plumbing, HVAC, interior and exterior finish -
assembled on-site in days, not months, using our „plug&play“ connectors

Modular Panel Housing
Dallas, TX
2026

4-5M

U.S. housing unit shortfall 

1 month

Project completion time

30-40%

Potential cost reduction 

panel explosion view

Every panel leaves the factory complete.

Nothing is figured out on site. Every wall panel is manufactured in a controlled factory environment and connects on-site via plug-and-play joints - structure, MEP, and finishes already done.

Structural Framing

Engineered framing built to specification under factory conditions - not field-cut, not improvised.

Pre-wired Electrical

All wiring is routed and terminated inside the panel before it ever leaves the factory.

Plumbing Ready

Penetrations, rough-in, and plug-in connection points integrated at  factory stage.

HVAC Prepared

Duct runs and connection points baked into the panel stack - not retrofitted on-site.

Interior Finished

Insulation, vapor barrier, drywall and paint done before leaving the factory 

Exterior Finished

Cladding, weather barrier, and window frames installed and quality-checked before transport.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     







                                        

First build. Dallas, TX.
Now recruiting a partner.

01

Design & Engineering

Finalize panel layout with partner input. Adapt to preferred ADU footprint and local code.

02

Factory Production

Manufacture panels in a Dallas-area warehouse. Document tolerances, QA, and build timings.

03

Transport Validation

Ship panels 500–1,000 miles. Validate logistics cost and panel integrity on arrival.

04

Site Assembly

Assemble into a livable ADU. Measure speed, labor hours, and capture a full snag list. 

05

Validation & Report

Structural, electrical, and plumbing sign-off. Results packaged for partners and permitting.

top layout view

  











 

interior ISO view

We're looking for one Dallas ADU builder.

Non-binding & low risk.
First-mover advantage in the fastest-growing construction market in the US. 

Let's design this together.

What We Ask

Sign a non-binding Letter of Intent to co-develop one ADU proof-of-concept unit

Contribute partial funding toward build cost - amount open to discussion

Provide a site or lot for the PoC build in or near Dallas

Share your preferred ADU layout so we can tailor the panel design to your market

Joint case study and PR rights on the completed build

What You Get

Exclusive first-partner status in the Dallas metro area

A fully assembled ADU delivered faster than any traditional build

Competitive edge: offer clients a faster, cleaner,
lower-cost product

Co-ownership input on design layout - shapes future panel configurations

Early equity conversation rights as we scale - be part of the founding story

Connect With Us

wooden exterior house render

© Copyright 2026 ModularH - All Rights Reserved

Mobirise.com